BlackCat.
TechMedix HABITAT BlackCat OS
Infrastructure Intelligence

BlackCat
Grid

Data centers, energy nodes, and network routing for autonomous robot fleets — orchestrated as one operating layer.

3 Facilities 26 Robots Online 99.96% Uptime Coming 2027

Data Centers

Three Facilities. One Mesh.

Collocated hardware at Equinix-partnered sites across Dallas, New York, and Los Angeles. Each site runs edge compute for regional robot fleets.

3
Active Facilities
99.96%
Avg Uptime
26
Robots Online
12 MW
Total Capacity
Online
DAL-01
Dallas, TX — Equinix DA6
Power 4.2 MW
PUE 1.38
Robots Served 12
Uptime (30d) 100%
Network 10 Gbps
Online
NYC-02
New York, NY — Equinix NY9
Power 3.8 MW
PUE 1.42
Robots Served 9
Uptime (30d) 99.94%
Network 10 Gbps
Maintenance
LAX-01
Los Angeles, CA — Equinix LA4
Power 4.0 MW
PUE 1.45
Robots Served 5
Uptime (30d) 99.61%
Network 10 Gbps

Data Center Platforms

Deployed
Knightscope K5
Security Autonomous Mobile Robot

360-degree optical + thermal sensors, autonomous patrol routing, live video relay to DAL-01 edge node.

Units4
Health Score94%
Deployed
Avidbots Neo
Autonomous Floor Scrubbing AMR

LIDAR-mapped facility cleaning with real-time fluid management telemetry to TechMedix dashboard.

Units5
Health Score97%
Deployed
Locus Origin AMR
Fulfillment Autonomous Mobile Robot

High-throughput pick-and-place with swarm coordination layer integrated into BlackCat OS routing.

Units8
Health Score99%

Infrastructure Partner

Equinix

Global colocation at 260+ IBX data centers. Carrier-neutral interconnection fabric.

3
BCR Sites
260+
IBX Centers
50+
Markets

Energy

Power the Fleet.

EV fleet nodes, on-site solar generation, and distributed HABITAT energy nodes form a resilient power mesh for autonomous operations.

847 kWh
Generated Today
312 kWh
Consumed
535 kWh
Net Surplus
$2.4K
V2G Revenue / Month
Charging
Tesla Model Y — Fleet-01
EV Node — DAL-01 Depot

Autonomous delivery vehicle. Currently on Level 2 AC charge at DAL-01 bay.

State of Charge 82%
0%Est. full in 38 min100%
Session Energy14.2 kWh
Charge Rate7.2 kW
V2G CapableYes
Active
ChargePoint CT4000
Level 2 AC Charger — DAL-01 Bay 3

Dual-port 7.2 kW AC charger. OCPP 1.6-compliant with BlackCat OS scheduling integration.

ProtocolOCPP 1.6
Output7.2 kW per port
Sessions Today6
Energy Delivered84.3 kWh
Fault CodesNone
EVgo fast charging station
Pending Partner
EVgo Fast Charging Network
Public DC Fast Charging — National Coverage
ProtocolCCS1 / CHAdeMO / NACS
Stalls5,000+ (1,200+ locations)
OutputUp to 350 kW per stall
Coverage47 states
Energy100% renewable
StatusIntegration Pending

EVgo Inside API integration in progress. Public fast charging nodes will appear alongside depot chargers in the Grid dashboard at launch.

HABITAT Solar Nodes

HABITAT-N01 — Dallas Site
Roof Array — 24 panels
318 kWh
Today
94 W/m²
Irradiance
✓ Online
HABITAT-N02 — Austin Site
Roof Array — 18 panels
241 kWh
Today
88 W/m²
Irradiance
✓ Online
HABITAT-N03 — Phoenix Site
Ground Array — 32 panels
288 kWh
Today
101 W/m²
Irradiance
✓ Online

Coming 2027

Coming 2027
Charge Scheduling

Node-based charge scheduling for EV fleets. Automated off-peak routing and demand response integration.

Coming 2027
V2G Trading

Vehicle-to-grid energy export during peak demand windows. Automated bidding into ISO markets via fleet battery assets.

Coming 2027
Node Billing

Per-vehicle, per-session billing layer. Fleet operators get itemized energy cost reports per robot, per route.

Infrastructure Partners

ChargePoint / HABITAT Solar / EVgo(pending)

Network

Always-On Connectivity.

Multi-bearer routing across Starlink, OneWeb, and 5G ensures zero-downtime command channels for every robot in the fleet.

3
Active Bearers
8 ms
Local Inference
99.99%
Uptime SLA
14 Gbps
Aggregate Throughput
Robot Fleet
26 Units
Online
MDC-1
Mobile Edge
Active
Bearer
Multi-Link
3 Paths
BCR Cloud
DAL-01
Reachable
Bearer Status
Starlink Gen 3
220 Mbps
42 ms latency
Active
OneWeb LEO
180 Mbps
36 ms latency
Active
5G mmWave
1.2 Gbps
4 ms latency
Active
MDC-1 — Mobile Edge Compute
CPU Utilization 67%
GPU Utilization 81%
Storage Used 44%
RAM 58%
Tethered Relay Drone
Model Elistair Safe-T2
Altitude 65 m AGL
Tether Connected
Relay Mode 4G LTE + Mesh
Coverage Radius 1.8 km
Uptime Today 14h 22m

Inference Routing

Edge-first. Cloud-fallback.

8 ms
Local Inference — MDC-1
/
41 ms
Cloud Fallback — DAL-01
/
94%
Requests Served Locally
[Simulated Data] Network telemetry panels display representative values. Live data will populate after BlackCat Grid infrastructure launch in 2027.

Launching 2027

Own a piece of the grid.

BlackCat Grid is the infrastructure layer for the autonomous economy. Data centers, energy nodes, and network routing — managed as one OS. Join the waitlist for early access and operator pricing.